Water Park Place Project, 88 Queens Quay, Toronto On 35-Storey Commercial Project with 3 levels of underground parking
Dear Sir/Madam:
Active Excavating was awarded the contract for excavation for the above noted project, on a lot size of 300 feet by 350 feet deep with a concrete cassion wall all around. Their work included excavating for tie-backs and stressing, removal of all contaminated material, maintaining a safe ramp and organizing trucking in safe and proper manner with traffic control due to lots of pedestrian traffic. Active Excavating preformed professionally in all area’s.
Active easily performed excavating three levels of underground parking and then excavated another 2m lower to the underside of the crane pad and footings. Also they carried out the shaving of the cassion wall with out any issues we also had vibration monitors under constant review by consultants to ensure the piles where never hit or moved through the entire process.
Active Excavating worked to our satisfaction and maintained our schedule even after starting a month late. Active Excavating has become the industry leader. I plan on working with Active Excavating again in the future.
Ellisdon Construction
Sebastian Palmieri
Site Superintendent
Recent Comments